Please note: EVR Scores currently apply only to software projects. – 3S Team

Impact Model

EVR Calculator

EVR: A Modern Metric For Project Stability

What Is EVR?

Escape Velocity Rate (EVR) is a new, quantitative metric that reveals whether your engineering team is introducing defects faster than it can fix them.

It helps answer a critical question:

Is my project stable — or at risk of accumulating backlog?

EVR provides an early warning signal of instability, long before schedule or quality issues become visible.

Your EVR Score
00.60.81.0
1.48
OUT OF CONTROL
Critical: Issues accumulating. Action required.
Under Capacity
Healthy
Warning
Out of Control
EVR Calculator

Adjust the values below to see if your project is stable or at risk of accumulating backlog.

Business ParametersValueComment
Project Inputs
Number of DevelopersUser input
Avg Developer Salary ($)Fully-loaded cost per developer (salary + benefits + overhead)
Project Release Cycle (Months)Duration for a single project release cycle
Defect Introduction Rate (defects/developer/month)3-7 by industry studies (IBM, Microsoft, NASA, Capers Jones, DORA reports)
Average Fix Time (days/defect/developer)1-3 days by industry benchmarks (CA Technologies)
3S Impact Assumptions
Output
Total Defects Fixed in Delivery Cycle396Defect fix capacity in delivery cycle
Total Defects Detected in Delivery Cycle588Defects introduced and detected in delivery cycle
EVR Score1.48Critical: Issues accumulating. Action required.

Critical EVR? See What's at Stake

Defect Backlog Explosion

Annual Backlog Growth:

384defects accumulate per year when EVR exceeds 1.0

Cost to fix in production:

$ 1.89MTechnical debt
Team Capacity Crisis

To keep pace, you need:

+3developers
48%capacity increase

Annual Cost:

$ 540KPer year, ongoing
Understanding EVR

Stay ahead of EVR with STAR

Monitor EVR trends early and understand the cost impact of quality decisions before risk accumulates.